Aquila Wind

Wind · ACEN Australia Pty Ltd · Wind Turbine - Onshore

Development AEMO: Publicly Announced Wind - Wind NEM data · 24 hours
300 MW
Researched capacity
Est. SRMC
$0.00/MWh
Key information
Capacity (AI)
300 MW

EPBC referral for Aquila Wind states installed capacity of up to 300 MW and includes a BESS; NSW Planning Portal and Infrastructure Pipeline corroborate 300 MW.

AEMO status Publicly Announced
Project status Development (AI)

ACEN Australia Aquila Wind site says it is in the early planning stages; NSW Planning Portal/EPBC show a proposed wind farm with up to 48 turbines and battery storage.

DUID
Owner ACEN Australia Pty Ltd
Commissioned
Expected closure
Closure date
Technology Wind Turbine - Onshore
Fuel Wind - Wind
Turbine OEM
Turbine model
Stats window
04 Jun 2026 04:05 → 05 Jun 2026 04:05 AEST

Dispatch & revenue

04 Jun 2026 04:05 → 05 Jun 2026 04:05 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Onshore wind farm - proposed / pre-construction
Capacity
300 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.00/MWh
Capex total (greenfield)
$649.60M

Shown in table
$649.60M (2026 real AUD)

Capex refurbishment
Capex / MW derived
$2,165,333

Shown in table
$2.17M (2026 real AUD)

Fixed OPEX (annual)
$5.80M

Shown in table
$5.80M (2026 real AUD)

Fixed OPEX / MW-yr
$29,000

Shown in table
$29.0k (2026 real AUD)

Variable OPEX / MWh
$0.00

Shown in table
$0.00 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 02 Jun 2026

Notes
Aquila Wind appears to be a proposed asset, not an operating registered NEM generator; no DUID was found. Official ACEN/NSW sources describe Aquila Wind as under assessment / Prepare EIS, with up to 48 turbines and up to 300 MW, while the user-supplied generator record states 200 MW. Financial values above are therefore not reported Aquila project costs: they are default 2025-26 Australian onshore-wind assumptions scaled to 200 MW. If scaled to ACEN/ANZIP's current up-to-300 MW project scope, the same default capex would imply AUD 974.4 million excluding the separately described 100 MW / 200 MWh battery. No generator-specific fixed O&M, variable O&M, refurbishment budget or closure date was found. Closure/decommissioning is represented only by ACEN's stated commitment to decommission project infrastructure at end of project life.

Sources