04 Jun 2026 04:05 → 05 Jun 2026 04:05 AEST
| Capex total (greenfield) |
$649.60M
Shown in table |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$2,165,333
Shown in table |
| Fixed OPEX (annual) |
$5.80M
Shown in table |
| Fixed OPEX / MW-yr |
$29,000
Shown in table |
| Variable OPEX / MWh |
$0.00
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 02 Jun 2026
Notes
Aquila Wind appears to be a proposed asset, not an operating registered NEM generator; no DUID was found. Official ACEN/NSW sources describe Aquila Wind as under assessment / Prepare EIS, with up to 48 turbines and up to 300 MW, while the user-supplied generator record states 200 MW. Financial values above are therefore not reported Aquila project costs: they are default 2025-26 Australian onshore-wind assumptions scaled to 200 MW. If scaled to ACEN/ANZIP's current up-to-300 MW project scope, the same default capex would imply AUD 974.4 million excluding the separately described 100 MW / 200 MWh battery. No generator-specific fixed O&M, variable O&M, refurbishment budget or closure date was found. Closure/decommissioning is represented only by ACEN's stated commitment to decommission project infrastructure at end of project life.