Yarwun 1 (YARWUN_1)

Gas Baseload · RTA Yarwun Pty Ltd · Turbine - CCGT

Operational AEMO: In Service QLD1 Fossil - Natural Gas Pipeline NEM data · 24 hours
180 MW
Registered nameplate capacity
24 hours revenue
$163.2k
Capacity factor
72.3%
Revenue / MWh
$52.23
Est. SRMC
$84.30/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.

Key information
Capacity
180 MW

AEMO status In Service
Project status Operational (AI)

AEMO registration indicates Yarwun 1 is In Service; commissioned 2012-06-01.

Region QLD1
Coordinates -23.83137, 151.15024 (AI)

Global Energy Monitor Yarwun power station satellite location.

MLF 0.9472
DUID YARWUN_1
Owner RTA Yarwun Pty Ltd
Commissioned Jun 2012
Expected closure 2050
Closure date
Technology Turbine - CCGT
Fuel Fossil - Natural Gas Pipeline
Gas turbine OEM GE
CCGT configuration / turbine model 2x1 CCGT (likely Frame 9F-class, specific model not documented)
Steam turbine OEM GE
Steam turbine model Steam turbine model not documented
Equipment confidence low
Stats window
13 Jun 2026 08:45 → 14 Jun 2026 08:45 AEST

Dispatch & revenue

13 Jun 2026 08:45 → 14 Jun 2026 08:45 AEST

Energy revenue (× MLF)
$163.2k
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
3,125.0 MWh
Available
3,190.0 MWh
Curtailed
262.3 MWh
Curtailment
8.2%
of available
MLF used
0.9472
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9470
2025-07-01 0.9472

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
CCGT
Capacity
180 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$84.30/MWh
Capex total (greenfield) default
$324.00M

Shown in table
$324.00M (2026 real AUD)

Capex refurbishment
Capex / MW default
$1,800,000

Shown in table
$1.80M (2026 real AUD)

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$35,000

Shown in table
$35.0k (2026 real AUD)

Variable OPEX / MWh default
$1.80

Shown in table
$1.80 (2026 real AUD)

Fuel cost / GJ default
$11.00

Shown in table
$11.00 (2026 real AUD)

Heat rate GJ/MWh default
7.50

Shown in table
$7.50 (2026 real AUD)

Confidence: unknown · Status: needs review · Capex basis: unknown