Wind · Pacific Hydro Yaloak South Pty Ltd · Wind Turbine - Onshore
15 Jun 2026 13:30 → 22 Jun 2026 13:30 AEST
| Capex total (greenfield) |
$179.56M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$6,256,377
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
$2.18M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$75,967
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$0.69
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 06 Jun 2026
Notes
Plant-specific capex was reported in the Clean Energy Australia 2016 report as a $130m investment for Pacific Hydro's Yaloak South project (28.7 MW). Pacific Blue states construction started in late 2016 and was completed in June 2018. No separate refurbishment cost found. O&M and technical assumptions use server-side fallback defaults because plant-specific onshore wind O&M benchmark values were not isolated in the retrieved sources. Asset life inferred from the community fund page stating $31,000 available each year over the 25-year life of the project.