Winton North Solar Farm (WINNSF1)

Solar · EE Solar 12 Pty Ltd as trustee for the EE Solar 12 Trust · Solar PV - Fixed

Construction AEMO: Publicly Announced VIC1 Solar - Solar NEM data · 654h
100/200 MW
Researched capacity / storage
654h revenue
$0
Capacity factor
0.0%
Revenue / MWh
—
Est. SRMC
$0.20/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. VIC1 regional price (RRP) on right axis.

Key information
Capacity (AI)
100 MW / 200 MWh

pv magazine Australia (2025) reports a 100 MW solar farm in stage 1 and a 100 MW / two-hour BESS in stage 2; European Energy Australia project page (au.europeanenergy.com) says more than 130 MW solar power.

AEMO status Publicly Announced
Project status Construction (AI)

European Energy Australia project page (au.europeanenergy.com) says Winton North Solar Farm with Battery is currently under construction; pv magazine Australia (2025) also says the hybrid project is under construction.

Region VIC1
Coordinates -36.30500, 146.40800 (AI)

European Energy Australia project page (au.europeanenergy.com) places the site approximately 22 km southwest of Wangaratta; ESC Victoria licence record places it in the vicinity of Winton, Victoria.

MLF 0.9277
DUID WINNSF1
Owner EE Solar 12 Pty Ltd as trustee for the EE Solar 12 Trust
Commissioned —
Expected closure —
Closure date —
Technology Solar PV - Fixed
Fuel Solar - Solar
Module OEM Ingeteam
Module / inverter supplier solar inverter supplier
Inverter OEM Ingeteam
Inverter model medium voltage power stations / inverter system
Equipment confidence medium
Stats window
01 Nov 2026 00:00 → 28 Nov 2026 05:35 AEST

Dispatch & revenue

01 Nov 2026 00:00 → 28 Nov 2026 05:35 AEST

Energy revenue (× MLF)
$0
FCAS revenue (× MLF)
$0
FCAS volume
— MWh
Dispatched
— MWh
Available
— MWh
Curtailed
— MWh
Curtailment
—
of available
MLF used
0.9277
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional price — dispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • State of charge — INITIAL_ENERGY_STORAGE (MWh at interval start) from UNIT_SOLUTION, published for bidirectional/storage units. Next-day data — the SOC line lags real time by up to a day.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2026-11-03 0.9277

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (fixed)
Capacity
100 MW / 200 MWh
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.20/MWh
Capex total (greenfield) default
$110.00M

Shown in table
$110.00M (2026 real AUD)

Capex refurbishment
—
Capex / MW default
$1,100,000

Shown in table
$1.10M (2026 real AUD)

Fixed OPEX (annual)
—
Fixed OPEX / MW-yr default
$18,000

Shown in table
$18.0k (2026 real AUD)

Variable OPEX / MWh default
$0.20

Shown in table
$0.20 (2026 real AUD)

Fuel cost / GJ
—
Heat rate GJ/MWh
—

Confidence: unknown · Status: needs review · Capex basis: unknown