03 Jun 2026 19:30 → 04 Jun 2026 19:30 AEST
| Capex total (greenfield) default |
$26.40M
Shown in table |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW default |
$2,200,000
Shown in table |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$55,000
Shown in table |
| Variable OPEX / MWh default |
$0.50
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: unknown · Status: needs review · Capex basis: unknown