West Wyalong Solar Farm (WSTWYSF1)

Solar · West Wyalong Fund Pty Ltd · Solar PV - Single axis tracking

Operational AEMO: In Service NSW1 Solar - Solar NEM data · 310h
105 MW
Registered nameplate capacity
310h revenue
$154.9k
Capacity factor
10.5%
Revenue / MWh
$45.27
Est. SRMC
$0.25/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.

Key information
Capacity
105 MW

AEMO status In Service
Project status Operational (AI)

AEMO registration notes commissioning on 2022-12-01; project appears in service and operating thereafter.

Region NSW1
Coordinates -33.92200, 147.19700 (AI)

Approximate site location near West Wyalong, NSW (project locality reference; exact plant coordinates not confirmed).

MLF 0.9220
DUID WSTWYSF1
Owner West Wyalong Fund Pty Ltd
Commissioned Dec 2022
Expected closure 2058
Closure date
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM LONGi
Module / inverter supplier Module / inverter supplier
Inverter OEM Sungrow
Inverter model SG350HX
Equipment confidence low
Stats window
01 Jun 2026 00:00 → 13 Jun 2026 22:00 AEST

Dispatch & revenue

01 Jun 2026 00:00 → 13 Jun 2026 22:00 AEST

Energy revenue (× MLF)
$154.9k
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
3,421.1 MWh
Available
3,389.4 MWh
Curtailed
3.0 MWh
Curtailment
0.1%
of available
MLF used
0.9220
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.8752
2025-07-01 0.9220

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
105 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.25/MWh
Capex total (greenfield) default
$136.85M

Shown in table
$136.85M (2026 real AUD)

Capex refurbishment
Capex / MW default
$1,300,000

Shown in table
$1.30M (2026 real AUD)

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$20,000

Shown in table
$20.0k (2026 real AUD)

Variable OPEX / MWh default
$0.25

Shown in table
$0.25 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: unknown · Status: needs review · Capex basis: unknown