Wagga North Solar Farm (WAGGNSF1)

Solar · Wagga Wagga Operationsco Pty Ltd as trustree for Wagga Wagga Operations Trust · Solar PV - Single axis tracking

Operational AEMO: In Commissioning NSW1 Solar - Solar NEM data · 24 hours
56 MW
Registered nameplate capacity
24 hours revenue
$13.8k
Capacity factor
21.3%
Revenue / MWh
$48.62
Est. SRMC
$0.25/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.

Key information
Capacity
56 MW

AEMO status In Commissioning
Project status Operational (AI)

waggawaggasolar.com.au (2024) states the solar farm construction is complete and operational.

Region NSW1
Coordinates -35.08500, 147.39200 (AI)

transgrid.com.au PDF (PSCR) says the site is approximately 9 km northeast of Wagga Wagga township in NSW.

MLF 0.8824
DUID WAGGNSF1
Owner Wagga Wagga Operationsco Pty Ltd as trustree for Wagga Wagga Operations Trust
Commissioned Jul 2023
Expected closure 2050
Closure date —
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM —
Module / inverter supplier single axis tracking solar PV
Inverter OEM —
Inverter model —
Equipment confidence low
Stats window
24 Sep 2026 00:00 → 24 Sep 2026 23:59 AEST

Dispatch & revenue

24 Sep 2026 00:00 → 24 Sep 2026 23:59 AEST

Energy revenue (× MLF)
$13.8k
FCAS revenue (× MLF)
$0
FCAS volume
— MWh
Dispatched
284.3 MWh
Available
403.7 MWh
Curtailed
119.4 MWh
Curtailment
29.6%
of available
MLF used
0.8824
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional price — dispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • State of charge — INITIAL_ENERGY_STORAGE (MWh at interval start) from UNIT_SOLUTION, published for bidirectional/storage units. Next-day data — the SOC line lags real time by up to a day.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.8720
2025-07-01 0.9183
2026-07-01 0.8824

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
56 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.25/MWh
Capex total (greenfield) default
$72.35M

Shown in table
$72.35M (2026 real AUD)

Capex refurbishment
—
Capex / MW default
$1,300,000

Shown in table
$1.30M (2026 real AUD)

Fixed OPEX (annual)
—
Fixed OPEX / MW-yr default
$20,000

Shown in table
$20.0k (2026 real AUD)

Variable OPEX / MWh default
$0.25

Shown in table
$0.25 (2026 real AUD)

Fuel cost / GJ
—
Heat rate GJ/MWh
—

Confidence: unknown · Status: needs review · Capex basis: unknown