BESS · Elements Green Australia Pty Ltd · Storage - Battery
01 Jun 2026 00:00 → 14 Jun 2026 03:30 AEST
| Capex total (greenfield) |
—
How this was derived |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage |
$369,198
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$25,000
Shown in table |
| Variable OPEX / MWh |
$1.58
Shown in table Reported / source value |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 05 Jun 2026
Notes
No plant-specific greenfield capex announcement was found for Tummaville Hybrid Facility - BESS (KCI). NEM stats indicate the project is publicly announced at 500 MW / 1,000 MWh, but no owner-reported total project cost was located in the search results. Internal server-side battery OPEX defaults were not used for fixed OPEX because no supporting public source was found. Commissioning date was not verified from public sources in the search results.