03 Jun 2026 20:50 → 04 Jun 2026 20:50 AEST
| Capex total (greenfield) |
—
|
|---|---|
| Capex refurbishment |
—
|
| Capex / MW default |
$1,200,000
Shown in table |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$45,000
Shown in table |
| Variable OPEX / MWh default |
$2.50
Shown in table |
| Fuel cost / GJ default |
$12.00
Shown in table |
| Heat rate GJ/MWh default |
10.50
Shown in table |
Confidence: unknown · Status: needs review · Capex basis: unknown