Tamworth BESS Project 1 Pty Ltd

BESS · Tamworth BESS Project 1 Pty Ltd · Storage - Battery

Development AEMO: Anticipated Other - Other NEM data · 24 hours
—
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$0.00/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Anticipated
Project status Development (AI)

Coordinates —

DUID —
Owner Tamworth BESS Project 1 Pty Ltd
Commissioned Dec 2027
Expected closure 2047
Closure date —
Technology Storage - Battery
Fuel Other - Other
Battery OEM —
Battery platform / chemistry —
Inverter OEM —
Inverter / PCS model —
Stats window
24 Sep 2026 07:55 → 25 Sep 2026 07:55 AEST

Dispatch & revenue

24 Sep 2026 07:55 → 25 Sep 2026 07:55 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Battery (BESS)
Capacity
—
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.00/MWh
Capex total (greenfield)
$458.00M

Shown in table
$458.00M (2026 real AUD)

Reported / source value
$458.00M (2026 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
This is a quoted estimate for Iberdrola's Kingswood BESS near Tamworth, not for Tamworth BESS Project 1 Pty Ltd.

Reference
Iberdrola gets govt nod for 270-MW New South Wales BESS project (low confidence)
Source recorded 06 Jun 2026

Capex refurbishment
—
Capex / MWh storage
—
Fixed OPEX (annual)
—
Fixed OPEX / MW-yr
$52,254

Shown in table
$52.3k (2026 real AUD)

Reported / source value
$51.0k (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
The AEMO/Aurecon review gives an indicative fixed O&M value of A$51,000/MW-net for BESS.

Reference
2024 Energy Technology Cost and Technical Parameter Review (high confidence)
Source recorded 06 Jun 2026

Variable OPEX / MWh
$0.00

Shown in table
$0.00 (2026 real AUD)

Reported / source value
$0.00 (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
The review indicates variable O&M is not typically specified for BESS under long-term service agreements.

Reference
2024 Energy Technology Cost and Technical Parameter Review (high confidence)
Source recorded 06 Jun 2026

Fuel cost / GJ
—
Heat rate GJ/MWh
—

Confidence: medium · Status: ai estimated · Capex basis: estimated · AI checked 06 Jun 2026

Notes
I could not find a plant-specific greenfield capital cost for the Tamworth BESS Project 1 Pty Ltd / Kingswood project in the sources searched. The strongest current evidence found indicates the nearby Kingswood Battery Energy Storage System (Iberdrola) is 270 MW / 1,080 MWh and an estimated A$458 million investment, but that is a different owner/entity and should not be assigned to this generator without confirmation. For battery O&M, I used AEMO/Aurecon 2024-25 indicative fixed O&M of A$51,000/MW-yr and variable O&M of nil; asset life was not explicitly sourced.

Sources