Wind · Star of the South Wind Farm Pty Ltd as trustee for the Star of the South Trust · Wind Turbine - Offshore
16 May 2026 01:35 → 15 Jun 2026 01:35 AEST
| Capex total (greenfield) |
—
How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
$4,746,835
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$405.13M
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX / MW-yr |
$184,149
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$0.00
Shown in table Reported / source value |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 06 Jun 2026
Notes
No plant-specific greenfield construction cost was located in official owner/government sources from the searches performed. An owner source states Star of the South will add $8 billion to the economy, but this is an economic benefit figure rather than project capex. AEMO/Aurecon 2024 offshore wind benchmark assumptions were used as fallback for fixed O&M and project life. The AEMO modelled offshore wind case uses 174,573 AUD/MW-yr fixed O&M and 30-year technical life.