Star of the South Wind Farm (SOTS1)

Wind · Star of the South Wind Farm Pty Ltd as trustee for the Star of the South Trust · Wind Turbine - Offshore

Development AEMO: Publicly Announced VIC1 Wind - Wind NEM data · 30 days
—
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$0.00/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Publicly Announced
Project status Development (AI)

Region VIC1
Coordinates —

DUID SOTS1
Owner Star of the South Wind Farm Pty Ltd as trustee for the Star of the South Trust
Commissioned Mar 2032
Expected closure —
Closure date —
Technology Wind Turbine - Offshore
Fuel Wind - Wind
Turbine OEM —
Turbine model —
Stats window
26 Aug 2026 05:55 → 25 Sep 2026 05:55 AEST

Dispatch & revenue

26 Aug 2026 05:55 → 25 Sep 2026 05:55 AEST

No dispatch data for DUID SOTS1 in this period.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Wind (offshore)
Capacity
—
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.00/MWh
Capex total (greenfield)
—

How this was derived
Owner site provides an economic benefit figure, not a capital cost or investment total.

Reference
Star of the South | Southerly Ten (high confidence)
Source recorded 06 Jun 2026

Capex refurbishment
—
Capex / MW
$4,746,835

Shown in table
$4.75M (2026 real AUD)

Reported / source value
$4.50M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
$405.13M

Shown in table
$405.13M (2026 real AUD)

Reported / source value
$384.06M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Annual fixed O&M derived from benchmark rate and project nameplate capacity.

Reference
Star of the South | Southerly Ten (medium confidence)
Source recorded 06 Jun 2026

Fixed OPEX / MW-yr
$184,149

Shown in table
$184.1k (2026 real AUD)

Reported / source value
$174.6k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
AEMO/Aurecon offshore wind benchmark fixed O&M used as fallback.

Reference
2024 Energy Technology Cost and Technical Parameter Review (high confidence)
Source recorded 06 Jun 2026

Variable OPEX / MWh
$0.00

Shown in table
$0.00 (2026 real AUD)

Reported / source value
$0.00 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fuel cost / GJ
—
Heat rate GJ/MWh
—

Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 06 Jun 2026

Notes
No plant-specific greenfield construction cost was located in official owner/government sources from the searches performed. An owner source states Star of the South will add $8 billion to the economy, but this is an economic benefit figure rather than project capex. AEMO/Aurecon 2024 offshore wind benchmark assumptions were used as fallback for fixed O&M and project life. The AEMO modelled offshore wind case uses 174,573 AUD/MW-yr fixed O&M and 30-year technical life.

Sources