Star of the South Wind Farm (SOTS1)

Wind · Star of the South Wind Farm Pty Ltd as trustee for the Star of the South Trust · Wind Turbine - Offshore

Development AEMO: Publicly Announced VIC1 Wind - Wind NEM data · 24 hours
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$0.00/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Publicly Announced
Project status Development (AI)

Region VIC1
Coordinates

DUID SOTS1
Owner Star of the South Wind Farm Pty Ltd as trustee for the Star of the South Trust
Commissioned Mar 2032
Expected closure
Closure date
Technology Wind Turbine - Offshore
Fuel Wind - Wind
Turbine OEM
Turbine model
Stats window
13 Jun 2026 17:45 → 14 Jun 2026 17:45 AEST

Dispatch & revenue

13 Jun 2026 17:45 → 14 Jun 2026 17:45 AEST

No dispatch data for DUID SOTS1 in this period.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Wind (offshore)
Capacity
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.00/MWh
Capex total (greenfield)

How this was derived
Owner site provides an economic benefit figure, not a capital cost or investment total.

Reference
Star of the South | Southerly Ten (high confidence)
Source recorded 06 Jun 2026

Capex refurbishment
Capex / MW
$4,746,835

Shown in table
$4.75M (2026 real AUD)

Reported / source value
$4.50M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
$405.13M

Shown in table
$405.13M (2026 real AUD)

Reported / source value
$384.06M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Annual fixed O&M derived from benchmark rate and project nameplate capacity.

Reference
Star of the South | Southerly Ten (medium confidence)
Source recorded 06 Jun 2026

Fixed OPEX / MW-yr
$184,149

Shown in table
$184.1k (2026 real AUD)

Reported / source value
$174.6k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
AEMO/Aurecon offshore wind benchmark fixed O&M used as fallback.

Reference
2024 Energy Technology Cost and Technical Parameter Review (high confidence)
Source recorded 06 Jun 2026

Variable OPEX / MWh
$0.00

Shown in table
$0.00 (2026 real AUD)

Reported / source value
$0.00 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 06 Jun 2026

Notes
No plant-specific greenfield construction cost was located in official owner/government sources from the searches performed. An owner source states Star of the South will add $8 billion to the economy, but this is an economic benefit figure rather than project capex. AEMO/Aurecon 2024 offshore wind benchmark assumptions were used as fallback for fixed O&M and project life. The AEMO modelled offshore wind case uses 174,573 AUD/MW-yr fixed O&M and 30-year technical life.

Sources