Riverina Energy Storage System 1 (RESS1G)

BESS · Shell New Energies Australia Pty Ltd · Storage - Battery

Operational AEMO: In Service NSW1 Other - Other NEM data · 24 hours
60/120 MW
Registered nameplate capacity / storage
Est. SRMC
$0.00/MWh
Key information
Capacity
60 MW / 120 MWh

AEMO status In Service
Project status Operational (AI)

Region NSW1
Coordinates

DUID RESS1G
Owner Shell New Energies Australia Pty Ltd
Commissioned Feb 2023
Expected closure 2051
Closure date
Technology Storage - Battery
Fuel Other - Other
Battery OEM
Battery platform / chemistry
Inverter OEM
Inverter / PCS model
Stats window
14 Jun 2026 06:05 → 15 Jun 2026 06:05 AEST

Dispatch & revenue

14 Jun 2026 06:05 → 15 Jun 2026 06:05 AEST

No dispatch data for DUID RESS1G in this period.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Battery (BESS)
Capacity
60 MW / 120 MWh
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.00/MWh
Capex total (greenfield)
$44.30M

Shown in table
$44.30M (2026 real AUD)

Reported / source value
$42.00M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Capex refurbishment
Capex / MWh storage derived
$369,198

Shown in table
$369.2k (2026 real AUD)

Reported / source value
$350.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
$1.37M

Shown in table
$1.37M (2026 real AUD)

Reported / source value
$1.30M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX / MW-yr
$22,785

Shown in table
$22.8k (2026 real AUD)

Reported / source value
$21.6k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Variable OPEX / MWh
$0.00

Shown in table
$0.00 (2026 real AUD)

Reported / source value
$0.00 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 06 Jun 2026

Notes
Riverina Energy Storage System 1 is a 60MW/120MWh battery partition within the broader Riverina project. Public sources identified the asset and its operation, but I did not find a project-specific total construction/investment cost for this 60MW tranche. As a fallback, battery O&M values were derived from AEMO's 2024 Energy Technology Cost and Technical Parameter Review; capex was left blank because no reliable plant-specific or benchmark figure was requested to be substituted without explicit need.