Richmond Valley BESS (EIWA)

BESS · EIWA Queensland Pty Ltd · Storage - Battery

AEMO: removed Other - Other NEM data · 7 days
300 MW
Registered nameplate capacity
Est. SRMC
$1.64/MWh
Key information
Capacity
300 MW

AEMO status removed
Project status (AI)

Coordinates

DUID
Owner EIWA Queensland Pty Ltd
Commissioned
Expected closure
Closure date
Technology Storage - Battery
Fuel Other - Other
Battery OEM
Battery platform / chemistry
Inverter OEM
Inverter / PCS model
Stats window
07 Jun 2026 17:10 → 14 Jun 2026 17:10 AEST

Dispatch & revenue

07 Jun 2026 17:10 → 14 Jun 2026 17:10 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Battery (BESS)
Capacity
300 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$1.64/MWh
Capex total (greenfield)
$4,585.15M

Shown in table
$4,585.15M (2026 real AUD)

Reported / source value
$4,200.00M (2023 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Included for transparency, but this is not attributable solely to Richmond Valley BESS and therefore was not used as capex.

Reference
NSW Government awards project an LTESA | Ark Energy (low confidence)
Source recorded 05 Jun 2026

Capex refurbishment
Capex / MWh storage
Fixed OPEX (annual)
$5.25M

Shown in table
$5.25M (2026 real AUD)

Reported / source value
$4.82M (2023 nominal)
Table total may differ if recalculated from $/MW × registered capacity after CPI adjustment.

Fixed OPEX / MW-yr
$17,467

Shown in table
$17.5k (2026 real AUD)

Reported / source value
$16.0k (2023 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
For the 8-hour battery case, the table shows fixed O&M of $16,000/MW-year for the base LFP BESS case used here.

Reference
2024 Energy Technology Cost and Technical Parameter Review (high confidence)
Source recorded 05 Jun 2026

Variable OPEX / MWh
$1.64

Shown in table
$1.64 (2026 real AUD)

Reported / source value
$1.50 (2023 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
The AEMO/Aurecon benchmark does not specify a separate variable O&M for BESS LTSA-style projects; the internal fallback of 1.5 AUD/MWh is retained as a conservative placeholder.

Reference
2024 Energy Technology Cost and Technical Parameter Review (high confidence)
Source recorded 05 Jun 2026

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: estimated · AI checked 05 Jun 2026

Notes
No plant-specific greenfield CAPEX for Richmond Valley BESS (EIWA) was found in the searched owner/government sources. Ark Energy's Richmond Valley Solar & BESS pages describe the project and size, and the NSW Government/AEMO Services tender notice confirms the BESS was awarded an LTESA, but none of the located sources state a battery-only project capital cost for the EIWA/Richmond Valley BESS unit. O&M and technical assumptions use AEMO/Aurecon 2024-25 battery storage benchmark inputs: 8-hour BESS fixed O&M $16,000/MW-year, variable O&M not typically charged separately for BESS LTSA-style projects, 20-year design life, and ~90% round-trip efficiency for LFP batteries. The project is larger than the 300.3 MW DUID capacity stated by the user in internal data; no source-backed storage duration was located in the searched results, so per-MWh capex could not be derived.