BESS · EIWA Queensland Pty Ltd · Storage - Battery
13 Jun 2026 11:10 → 14 Jun 2026 11:10 AEST
| Capex total (greenfield) |
$4,585.15M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage |
—
|
| Fixed OPEX (annual) |
$5.25M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$17,467
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$1.64
Shown in table Reported / source value How this was derived Reference |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: estimated · AI checked 05 Jun 2026
Notes
No plant-specific greenfield CAPEX for Richmond Valley BESS (EIWA) was found in the searched owner/government sources. Ark Energy's Richmond Valley Solar & BESS pages describe the project and size, and the NSW Government/AEMO Services tender notice confirms the BESS was awarded an LTESA, but none of the located sources state a battery-only project capital cost for the EIWA/Richmond Valley BESS unit. O&M and technical assumptions use AEMO/Aurecon 2024-25 battery storage benchmark inputs: 8-hour BESS fixed O&M $16,000/MW-year, variable O&M not typically charged separately for BESS LTSA-style projects, 20-year design life, and ~90% round-trip efficiency for LFP batteries. The project is larger than the 300.3 MW DUID capacity stated by the user in internal data; no source-backed storage duration was located in the searched results, so per-MWh capex could not be derived.