Philip Island BESS (PIBESS1)

BESS · Mondo Power · Storage - Battery

Operational AEMO: In Service VIC1 Other - Other NEM data · 7 days
5/10 MW
Registered nameplate capacity / storage
7 days revenue
$3.1k
Capacity factor
-10.8%
Revenue / MWh
—
Est. SRMC
$1.50/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. VIC1 regional price (RRP) on right axis.

Key information
Capacity
5 MW / 10 MWh

AEMO status In Service
Project status Operational (AI)

Mondo project page and AEMO data indicate the Phillip Island battery is in service and commissioned in 2023.

Region VIC1
Coordinates —

MLF 0.9920
DUID PIBESS1
Owner Mondo Power
Commissioned May 2023
Expected closure 2038
Closure date —
Technology Storage - Battery
Fuel Other - Other
Battery OEM Hitachi ABB Power Grids
Battery platform / chemistry battery storage system
Inverter OEM —
Inverter / PCS model —
Equipment confidence medium
Stats window
18 Sep 2026 09:30 → 25 Sep 2026 09:30 AEST

Dispatch & revenue

18 Sep 2026 09:30 → 25 Sep 2026 09:30 AEST

Energy revenue (× MLF)
$3.1k
FCAS revenue (× MLF)
$1.2k
FCAS volume
362.2 MWh
Dispatched
-90.6 MWh
Available
701.7 MWh
Curtailed
795.9 MWh
Curtailment
113.4%
of available
MLF used
0.9920
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

🔋 State of charge

Stored energy at the start of each 5‑minute interval (AEMO INITIAL_ENERGY_STORAGE). Available up to the latest next‑day dispatch file.

5.9 MWh 59%
at 25 Sep 04:00 · of 10 MWh registered

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional price — dispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • State of charge — INITIAL_ENERGY_STORAGE (MWh at interval start) from UNIT_SOLUTION, published for bidirectional/storage units. Next-day data — the SOC line lags real time by up to a day.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-08-15 0.9848
2025-07-01 0.9862
2026-07-01 0.9920

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Battery (BESS)
Capacity
5 MW / 10 MWh
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$1.50/MWh
Capex total (greenfield) default
$3.50M

Shown in table
$3.50M (2026 real AUD)

Capex refurbishment
—
Capex / MWh storage default
$350,000

Shown in table
$350.0k (2026 real AUD)

Fixed OPEX (annual)
—
Fixed OPEX / MW-yr default
$25,000

Shown in table
$25.0k (2026 real AUD)

Variable OPEX / MWh default
$1.50

Shown in table
$1.50 (2026 real AUD)

Fuel cost / GJ
—
Heat rate GJ/MWh
—

Confidence: unknown · Status: needs review · Capex basis: unknown