Pacific Green Energy Park Portland West

BESS · Pacific Green Energy Park Portland West Trust · Storage - Battery

Development AEMO: Publicly Announced Other - Other NEM data · 24 hours
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$1.58/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Publicly Announced
Project status Development (AI)

Coordinates

DUID
Owner Pacific Green Energy Park Portland West Trust
Commissioned
Expected closure
Closure date
Technology Storage - Battery
Fuel Other - Other
Battery OEM
Battery platform / chemistry
Inverter OEM
Inverter / PCS model
Stats window
13 Jun 2026 02:20 → 14 Jun 2026 02:20 AEST

Dispatch & revenue

13 Jun 2026 02:20 → 14 Jun 2026 02:20 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Battery (BESS)
Capacity
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$1.58/MWh
Capex total (greenfield)
$1,582.28M

Shown in table
$1,582.28M (2026 real AUD)

Reported / source value
$1,500.00M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Pacific Green's Portland Energy Park preliminary documentation states the project involves direct investment of approximately A$1.5 billion.

Reference
Preliminary Documentation (high confidence)
Source recorded 06 Jun 2026

Capex refurbishment
Capex / MWh storage

How this was derived
The project page states the site size as 2,500MWh, allowing a derived capex per MWh of A$600,000 using the reported A$1.5 billion investment.

Reference
Portland Energy Park (high confidence)
Source recorded 06 Jun 2026

Fixed OPEX (annual)
Fixed OPEX / MW-yr
$26,371

Shown in table
$26.4k (2026 real AUD)

Reported / source value
$25.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No project-specific fixed O&M figure was found, so the provided internal default was retained.

Variable OPEX / MWh
$1.58

Shown in table
$1.58 (2026 real AUD)

Reported / source value
$1.50 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No project-specific variable O&M figure was found, so the provided internal default was retained.

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 06 Jun 2026

Notes
Project-specific reported direct investment of approximately A$1.5 billion was found in Pacific Green's Portland Energy Park preliminary documentation. The site is described as 1,000MW / 2,500MWh and the investment figure is treated as the greenfield project cost. Fixed OPEX default retained from server-side fallback because no project-specific O&M figure was found. Battery asset life noted by Pacific Green as 20 years.

Sources