BESS · Pacific Green Energy Park Portland West Trust · Storage - Battery
13 Jun 2026 02:20 → 14 Jun 2026 02:20 AEST
| Capex total (greenfield) |
$1,582.28M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage |
—
How this was derived Reference |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr |
$26,371
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$1.58
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 06 Jun 2026
Notes
Project-specific reported direct investment of approximately A$1.5 billion was found in Pacific Green's Portland Energy Park preliminary documentation. The site is described as 1,000MW / 2,500MWh and the investment figure is treated as the greenfield project cost. Fixed OPEX default retained from server-side fallback because no project-specific O&M figure was found. Battery asset life noted by Pacific Green as 20 years.