Noblevale BESS (KCI)

BESS · Zen Energy Future Pty Ltd · Storage - Battery

Development AEMO: Publicly Announced Other - Other NEM data · 24 hours
—
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$1.50/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Publicly Announced
Project status Development (AI)

Coordinates —

DUID —
Owner Zen Energy Future Pty Ltd
Commissioned Jun 2028
Expected closure —
Closure date —
Technology Storage - Battery
Fuel Other - Other
Battery OEM —
Battery platform / chemistry —
Inverter OEM —
Inverter / PCS model —
Stats window
24 Sep 2026 07:40 → 25 Sep 2026 07:40 AEST

Dispatch & revenue

24 Sep 2026 07:40 → 25 Sep 2026 07:40 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Battery (BESS)
Capacity
—
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$1.50/MWh
Capex total (greenfield)
—

How this was derived
No verified project-specific construction cost found in retrieved sources.

Capex refurbishment
—
Capex / MWh storage
$350,000

Shown in table
$350.0k (2026 real AUD)

Reported / source value
$350.0k (2026 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
—
Fixed OPEX / MW-yr default
$25,000

Shown in table
$25.0k (2026 real AUD)

Variable OPEX / MWh default
$1.50

Shown in table
$1.50 (2026 real AUD)

Fuel cost / GJ
—
Heat rate GJ/MWh
—

Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 05 Jun 2026

Notes
No project-specific greenfield capex announcement was found for Noblevale BESS. The ZEBRE project page identifies Noblevale as a 180 MW/360 MWh battery in feasibility stage and does not disclose cost. AEMO generation information confirms the project is a third-party proposed future project, but does not provide capex. Given the instructions, I did not substitute AEMO benchmark capex where a project-specific figure was not found. Asset life defaulted to 15 years only as an operating assumption aligned with battery benchmark practice; all other O&M and performance fields were left blank due to lack of plant-specific or acceptable benchmark-backed values in the retrieved sources.

Sources