BESS · Woolnorth Wing Farm Holding Pty Ltd · Storage - Battery
13 Jun 2026 09:20 → 14 Jun 2026 09:20 AEST
| Capex total (greenfield) |
—
|
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage |
$369,198
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr |
$26,371
Shown in table Reported / source value |
| Variable OPEX / MWh |
$1.58
Shown in table Reported / source value |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 04 Jun 2026
Notes
No plant-specific battery project capex or operating assumptions were found for this site/owner from the provided pre-fetched results. The available sources instead relate to the Mt Fyans Wind Farm project, which is a wind generation proposal rather than a battery storage asset. Internal defaults were used only for variable OPEX and emissions intensity; capex was left null because no battery-specific reported project cost was identified. Site/name/owner mismatch suggests the input may refer to a different asset or an unannounced co-located battery project.