15 May 2026 13:35 → 14 Jun 2026 13:35 AEST
| Capex total (greenfield) |
$250.84M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage |
—
How this was derived Reference |
| Fixed OPEX (annual) |
$4.61M
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX / MW-yr |
$30,738
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$1.54
Shown in table Reported / source value |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 04 Jun 2026
Notes
Plant-specific project cost was found in NSW planning documents for StorEnergy 3 Pty Ltd: estimated development cost AUD 244,815,000 excl. GST for a 150 MW / 730 MWh BESS. OPEX was not published as a simple per-MW figure, so fixed OPEX is an AI-derived approximation from the project’s disclosed annual operating expenditure and should be reviewed. No fuel cost or heat rate applies to battery storage.