MacIntyre Wind Farm (MCINTYR1)

Wind · Macintyre Windfarm Pty Ltd and Arc Energy Macintyre Pty Ltd · Wind Turbine - Onshore

Committed* QLD1 Wind - Wind NEM data · 24 hours
923 MW
Registered nameplate capacity
24 hours revenue
$425.2k
Capacity factor
25.6%
Revenue / MWh
$75.06
Est. SRMC
$0.58/MWh
MLF
0.9723

Stats window 29 May 2026 04:00 → 30 May 2026 04:00 AEST

Key information
Capacity
923 MW
Status Committed*
Lifecycle Pre-operating
Region QLD1
DUID MCINTYR1
Owner Macintyre Windfarm Pty Ltd and Arc Energy Macintyre Pty Ltd
Commissioned Nov 2025
Expected closure 2025-07-02
Closure date
Technology Wind Turbine - Onshore
Fuel Wind - Wind
Turbine OEM
Turbine model

Dispatch & revenue

29 May 2026 04:00 → 30 May 2026 04:00 AEST

Revenue (× MLF)
$425.2k
Dispatched
5,664.9 MWh
Available
5,664.9 MWh
Curtailed
MWh
Curtailment
0.0%
of available
MLF used
0.9723
end of period

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.

Revenue (× MLF)

Estimated $ per interval using regional RRP and MLF effective on each day.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF. Chart uses MLF effective on each interval’s date; summary total uses MLF as at the end of the selected period (same as the revenue list).
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-08-13 0.9734
2025-07-01 0.9723

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Wind (onshore)
Capacity
923 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.58/MWh
Capex total (greenfield)
$2,082.51M

Source value
$2,000.00M (2022 nominal)

How this was derived
Official ACCIONA announcement of total construction investment for the MacIntyre Wind Precinct.

Reference
Golden age for renewable energy dawns as construction starts on Australia’s largest wind farm (high confidence)

Capex refurbishment
Capex / MW
$2,255,259

Source value
$1.93M (2022 nominal)

How this was derived
Derived per-MW capex using the official precinct investment and precinct capacity.

Reference
Golden age for renewable energy dawns as construction starts on Australia’s largest wind farm (medium confidence)

Capex / MWh storage
Fixed OPEX (annual)
$59.33M

Source value
$50.79M (2022 nominal)

Fixed OPEX / MW-yr
$64,252

Source value
$55.0k (2022 nominal)

How this was derived
Fallback default supplied by user instructions; no plant-specific official O&M figure found in the searched sources.

Variable OPEX / MWh
$0.58

Source value
$0.50 (2022 nominal)

How this was derived
Fallback default supplied by user instructions; no plant-specific official variable O&M figure found in the searched sources.

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 04 Jun 2026

Notes
Wind asset—fuel use/heat rate not applicable. CAPEX and O&M populated from AEMO/CSIRO ETC review where available; no brownfield/turbine replacement refurbishment identified in searched sources for this DUID as of 2026-06-04.

Latest AI note (4 Jun 2026)

Used project-specific reported construction investment of about AUD 2.0 billion for the 1,026 MW MacIntyre Wind Precinct, which includes the 923.4 MW MacIntyre Wind Farm. No separate plant-only capex for the 923.4 MW asset was found in official sources, so the precinct-level figure was allocated across the MacIntyre wind farm capacity for normalization. CleanCo/ACCIONA sources confirm the 923 MW asset is part of the 1,026 MW precinct and that the precinct’s total investment is about AUD 2 billion.

Sources