Wind · Macintyre Windfarm Pty Ltd and Arc Energy Macintyre Pty Ltd · Wind Turbine - Onshore
Stats window 29 May 2026 04:00 → 30 May 2026 04:00 AEST
29 May 2026 04:00 → 30 May 2026 04:00 AEST
Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.
Estimated $ per interval using regional RRP and MLF effective on each day.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).| Effective from | MLF |
|---|---|
| 2024-08-13 | 0.9734 |
| 2025-07-01 | 0.9723 |
| Capex total (greenfield) |
$2,082.51M
Source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
$2,255,259
Source value How this was derived Reference |
| Capex / MWh storage |
—
|
| Fixed OPEX (annual) |
$59.33M
Source value |
| Fixed OPEX / MW-yr |
$64,252
Source value How this was derived |
| Variable OPEX / MWh |
$0.58
Source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 04 Jun 2026
Notes
Wind asset—fuel use/heat rate not applicable. CAPEX and O&M populated from AEMO/CSIRO ETC review where available; no brownfield/turbine replacement refurbishment identified in searched sources for this DUID as of 2026-06-04.
Used project-specific reported construction investment of about AUD 2.0 billion for the 1,026 MW MacIntyre Wind Precinct, which includes the 923.4 MW MacIntyre Wind Farm. No separate plant-only capex for the 923.4 MW asset was found in official sources, so the precinct-level figure was allocated across the MacIntyre wind farm capacity for normalization. CleanCo/ACCIONA sources confirm the 923 MW asset is part of the 1,026 MW precinct and that the precinct’s total investment is about AUD 2 billion.