Lake Bonney 3 Wind Farm (LKBONNY3)

Wind · Lake Bonney Wind Power Pty Ltd · Wind Turbine - Onshore

Operational AEMO: In Service SA1 Wind - Wind NEM data · 7 days
39 MW
Registered nameplate capacity
7 days revenue
$47.9k
Capacity factor
19.8%
Revenue / MWh
$36.92
Est. SRMC
$0.53/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. SA1 regional price (RRP) on right axis.

Key information
Capacity
39 MW

AEMO status In Service
Project status Operational (AI)

Iberdrola Australia asset page says Lake Bonney 3 is part of the operating Lake Bonney Wind Farms; final stage commenced operations in 2009.

Region SA1
Coordinates -37.84000, 140.37000 (AI)

Iberdrola Australia says the wind farms are on the Woakwine Range about 2 km from the eastern shore of Lake Bonney near Millicent, South Australia.

MLF 0.9468
DUID LKBONNY3
Owner Lake Bonney Wind Power Pty Ltd
Commissioned —
Expected closure 2040
Closure date —
Technology Wind Turbine - Onshore
Fuel Wind - Wind
Turbine OEM Vestas
Turbine model V66 / V90
Equipment confidence high
Stats window
18 Sep 2026 05:50 → 25 Sep 2026 05:50 AEST

Dispatch & revenue

18 Sep 2026 05:50 → 25 Sep 2026 05:50 AEST

Energy revenue (× MLF)
$47.9k
FCAS revenue (× MLF)
$0
FCAS volume
— MWh
Dispatched
1,296.8 MWh
Available
2,414.4 MWh
Curtailed
1,125.4 MWh
Curtailment
46.6%
of available
MLF used
0.9468
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional price — dispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • State of charge — INITIAL_ENERGY_STORAGE (MWh at interval start) from UNIT_SOLUTION, published for bidirectional/storage units. Next-day data — the SOC line lags real time by up to a day.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9709
2025-07-01 0.9297
2026-07-01 0.9468

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Wind (onshore)
Capacity
39 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.53/MWh
Capex total (greenfield)
$90.51M

Shown in table
$90.51M (2026 real AUD)

Reported / source value
$85.80M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Capex refurbishment
—
Capex / MW derived
$2,320,675

Shown in table
$2.32M (2026 real AUD)

Reported / source value
$2.20M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
—
Fixed OPEX / MW-yr default
$55,000

Shown in table
$55.0k (2026 real AUD)

Variable OPEX / MWh
$0.53

Shown in table
$0.53 (2026 real AUD)

Reported / source value
$0.50 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fuel cost / GJ
—
Heat rate GJ/MWh
—

Confidence: low · Status: ai estimated · Capex basis: default · AI checked 09 Jun 2026

Notes
Could not find a plant-specific greenfield construction cost for Lake Bonney 3 from the owner/developer or government sources in the available searches. Available sources confirm Stage 3 is a 39 MW onshore wind project commissioned in 2009/2010, but do not state the total project capex. Use server-side fallback only if needed downstream. No refurbishment cost identified.

Sources