15 May 2026 06:20 → 14 Jun 2026 06:20 AEST
| Capex total (greenfield) |
$2,985.07M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage |
—
How this was derived Reference |
| Fixed OPEX (annual) |
$6.22M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$31,095
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$1.87
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 06 Jun 2026
Notes
Project described by NSW Planning Portal as a 200 MW / 800 MWh battery energy storage facility. The capex figure is from a 2021 media report quoting CEP Energy's stated $2.4bn battery project cost for Kurri Kurri; this appears to refer to the original greenfield project announcement and matches the 1,200 MW concept widely reported in 2021, not the later 200 MW / 800 MWh planning application. Therefore capex may not precisely match the current site configuration and should be reviewed. No site-specific O&M disclosure found; internal defaults used for O&M. Battery storage has zero direct emissions and no heat rate or fuel cost.