Koolunga Battery Energy Storage System 2

BESS · Equis Energy (Australia) Projects (Ngumi 6) Pty Ltd as trustee for the Equis Energy (Australia) Ngumi 6 Asset Trust · Storage - Battery

Development AEMO: Publicly Announced Other - Other NEM data · 24 hours
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$1.50/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Publicly Announced
Project status Development (AI)

Coordinates

DUID
Owner Equis Energy (Australia) Projects (Ngumi 6) Pty Ltd as trustee for the Equis Energy (Australia) Ngumi 6 Asset Trust
Commissioned Jun 2026
Expected closure
Closure date
Technology Storage - Battery
Fuel Other - Other
Battery OEM
Battery platform / chemistry
Inverter OEM
Inverter / PCS model
Stats window
13 Jun 2026 09:20 → 14 Jun 2026 09:20 AEST

Dispatch & revenue

13 Jun 2026 09:20 → 14 Jun 2026 09:20 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Battery (BESS)
Capacity
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$1.50/MWh
Capex total (greenfield)
$110.00M

Shown in table
$110.00M (2026 real AUD)

Reported / source value
$110.00M (2026 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Reported EPC contract value for the project; used as the closest project-specific figure available.

Reference
ASX Release: GenusPlus awarded Koolunga Battery Energy Storage System Project (high confidence)
Source recorded 09 Jun 2026

Capex refurbishment
Capex / MWh storage

How this was derived
Derived from the reported EPC contract value and the 800 MWh storage size.

Reference
ASX Release: GenusPlus awarded Koolunga Battery Energy Storage System Project (high confidence)
Source recorded 09 Jun 2026

Fixed OPEX (annual)
$5.00M

Shown in table
$5.00M (2026 real AUD)

Reported / source value
$5.00M (2026 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Derived from fallback fixed O&M assumption and the project capacity.

Fixed OPEX / MW-yr
$25,000

Shown in table
$25.0k (2026 real AUD)

Reported / source value
$25.0k (2026 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No plant-specific fixed O&M disclosed in searched sources; default used.

Variable OPEX / MWh
$1.50

Shown in table
$1.50 (2026 real AUD)

Reported / source value
$1.50 (2026 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No plant-specific variable O&M disclosed in searched sources; default used.

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 09 Jun 2026

Notes
Project-specific capex could not be found in owner/government materials. The $110 million figure is the GenusPlus EPC contract value reported for the 200 MW / 800 MWh Koolunga BESS, which is a construction contract proxy rather than a disclosed total project investment; it was used as the best available reported project-specific figure. Fixed OPEX used server-side fallback because no plant-specific O&M was found. Battery assets have no fuel cost or heat rate; emissions intensity assumed zero. The project is reported as due to reach commercial operation in 1H 2028, so the commissioned/online date of 2026-06-01 appears inconsistent with sourced information.