BESS · Equis Energy (Australia) Projects (Ngumi 6) Pty Ltd as trustee for the Equis Energy (Australia) Ngumi 6 Asset Trust · Storage - Battery
13 Jun 2026 09:20 → 14 Jun 2026 09:20 AEST
| Capex total (greenfield) |
$110.00M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage |
—
How this was derived Reference |
| Fixed OPEX (annual) |
$5.00M
Shown in table Reported / source value How this was derived |
| Fixed OPEX / MW-yr |
$25,000
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$1.50
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 09 Jun 2026
Notes
Project-specific capex could not be found in owner/government materials. The $110 million figure is the GenusPlus EPC contract value reported for the 200 MW / 800 MWh Koolunga BESS, which is a construction contract proxy rather than a disclosed total project investment; it was used as the best available reported project-specific figure. Fixed OPEX used server-side fallback because no plant-specific O&M was found. Battery assets have no fuel cost or heat rate; emissions intensity assumed zero. The project is reported as due to reach commercial operation in 1H 2028, so the commissioned/online date of 2026-06-01 appears inconsistent with sourced information.