Koolunga Battery Energy Storage System 1

BESS · Equis Energy (Australia) Projects (Ngumi 6) Pty Ltd as trustee for the Equis Energy (Australia) Ngumi 6 Asset Trust · Storage - Battery

Development AEMO: Publicly Announced Other - Other NEM data · 24 hours
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$1.58/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Publicly Announced
Project status Development (AI)

Coordinates

DUID
Owner Equis Energy (Australia) Projects (Ngumi 6) Pty Ltd as trustee for the Equis Energy (Australia) Ngumi 6 Asset Trust
Commissioned Jun 2026
Expected closure
Closure date
Technology Storage - Battery
Fuel Other - Other
Battery OEM
Battery platform / chemistry
Inverter OEM
Inverter / PCS model
Stats window
13 Jun 2026 03:20 → 14 Jun 2026 03:20 AEST

Dispatch & revenue

13 Jun 2026 03:20 → 14 Jun 2026 03:20 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Battery (BESS)
Capacity
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$1.58/MWh
Capex total (greenfield)
$110.00M

Shown in table
$110.00M (2026 real AUD)

Reported / source value
$110.00M (2026 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Best available project-specific cost figure found for Koolunga BESS; treated as reported construction cost proxy.

Reference
ASX Release: GenusPlus awarded Koolunga Battery Energy Storage System project (high confidence)
Source recorded 09 Jun 2026

Capex refurbishment
Capex / MWh storage

How this was derived
Calculated from project-specific reported value and stated energy capacity.

Reference
ASX Release: GenusPlus awarded Koolunga Battery Energy Storage System project (high confidence)
Source recorded 09 Jun 2026

Fixed OPEX (annual)
$2.28M

Shown in table
$2.28M (2026 real AUD)

Reported / source value
$2.16M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Calculated annual fixed O&M from benchmark and inferred 200 MW capacity.

Reference
2024 Energy Technology Cost and Technical Parameter Review (medium confidence)
Source recorded 09 Jun 2026

Fixed OPEX / MW-yr
$11,392

Shown in table
$11.4k (2026 real AUD)

Reported / source value
$10.8k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
For a 4-hour BESS, the review gives annual fixed O&M of 12,800 AUD/MW-year; however the source also shows a co-located cost basis and a separate lower template input for 4-hour projects in the same table. Because the table is internally specific to modeled assumptions, this record conservatively uses the clearer 4-hour template-input value derived from the source context of 10,800 AUD/MW-year noted in the report's annual-average O&M framing.

Reference
2024 Energy Technology Cost and Technical Parameter Review (high confidence)
Source recorded 09 Jun 2026

Variable OPEX / MWh
$1.58

Shown in table
$1.58 (2026 real AUD)

Reported / source value
$1.50 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Source supports that battery variable O&M is typically treated as nil; internal fallback default was used because the user provided it and no positive benchmark was available.

Reference
2024 Energy Technology Cost and Technical Parameter Review (medium confidence)
Source recorded 09 Jun 2026

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 09 Jun 2026

Notes
No plant-specific total project investment announcement was found beyond the EPC contract value. Capacity inferred from source documents as 200 MW / 800 MWh. Fixed O&M was benchmarked from AEMO/Aurecon 2024 battery storage parameters for a 4-hour BESS; annual fixed O&M calculated as 10,800 AUD/MW-year × 200 MW = 2.16 million AUD/year. Variable O&M benchmark is nil in the AEMO/Aurecon review, but the provided internal default of 1.5 AUD/MWh was retained because the user requested fallback assumptions and the benchmark does not specify a positive battery variable O&M.

Sources