BESS · Equis Energy (Australia) Projects (Ngumi 6) Pty Ltd as trustee for the Equis Energy (Australia) Ngumi 6 Asset Trust · Storage - Battery
13 Jun 2026 03:20 → 14 Jun 2026 03:20 AEST
| Capex total (greenfield) |
$110.00M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage |
—
How this was derived Reference |
| Fixed OPEX (annual) |
$2.28M
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX / MW-yr |
$11,392
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$1.58
Shown in table Reported / source value How this was derived Reference |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 09 Jun 2026
Notes
No plant-specific total project investment announcement was found beyond the EPC contract value. Capacity inferred from source documents as 200 MW / 800 MWh. Fixed O&M was benchmarked from AEMO/Aurecon 2024 battery storage parameters for a 4-hour BESS; annual fixed O&M calculated as 10,800 AUD/MW-year × 200 MW = 2.16 million AUD/year. Variable O&M benchmark is nil in the AEMO/Aurecon review, but the provided internal default of 1.5 AUD/MWh was retained because the user requested fallback assumptions and the benchmark does not specify a positive battery variable O&M.