BESS · Iberdrola Australia Development Pty Ltd. · Storage - Battery
13 Jun 2026 16:25 → 14 Jun 2026 16:25 AEST
| Capex total (greenfield) |
$403.28M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage |
—
|
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr |
$5,063
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh default |
$1.50
Shown in table How this was derived Reference |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 09 Jun 2026
Notes
Project is proposed/under development. Owner filing states up to 270 MW and 1,080 MWh. Capex derived from the NSW planning portal estimated development cost, which is the plant-specific reported project cost available in search results. Fixed O&M taken from AEMO/Aurecon 2024 large-scale lithium-ion BESS benchmark for a 4-hour system; variable O&M not separately stated for BESS in the benchmark.