12 Jun 2026 23:45 → 13 Jun 2026 23:45 AEST
| Capex total (greenfield) |
—
|
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage |
$358,607
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr |
$25,615
Shown in table Reported / source value |
| Variable OPEX / MWh |
$1.54
Shown in table Reported / source value |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 09 Jun 2026
Notes
Plant-specific greenfield capex was not found in official owner/government materials available in search. The project is proposed at 150 MW / 600 MWh and is described by SA government as Kincraig Battery Pty Ltd (a subsidiary of TagEnergy, formerly ACE Power). Fallback O&M assumptions use server defaults; fixed OPEX annual total could not be calculated because the capacity MW field was not provided in the prompt.