Solar · Genex Power Limited · Solar PV - Fixed
22 Jun 2026 00:00 → 22 Jun 2026 00:00 AEST
| Capex total (greenfield) |
$155.98M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$3,119,514
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$18,000
Shown in table |
| Variable OPEX / MWh default |
$0.20
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 09 Jun 2026
Notes
Genex states the project reached financial close in February 2017 with total funded construction cost of $115M and project cost of $115,422,000; first energisation occurred in November 2017. No plant-specific O&M values were found in the searched sources, so O&M fields are left null rather than inferred from generic benchmarks.