13 Jun 2026 15:45 → 14 Jun 2026 15:45 AEST
| Capex total (greenfield) |
—
How this was derived |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
$1,265,823
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr |
$14,838
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$4.94
Shown in table Reported / source value How this was derived Reference |
| Fuel cost / GJ |
$12.66
Shown in table Reported / source value How this was derived |
| Heat rate GJ/MWh |
10.50
Shown in table How this was derived |
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 09 Jun 2026
Notes
No reliable plant-specific greenfield capex announcement was found for Kerrawary Power Station. O&M and technology parameters were inferred from AEMO/Aurecon 2024 OCGT benchmark data for a large gas turbine, with fuel cost and heat rate falling back to the provided internal defaults. The fixed O&M source is for a Large GT proxy, not site-specific.