Kerang Hybrid

BESS · Kerang Power Pty Ltd · Storage - Battery

Development AEMO: Publicly Announced Other - Other NEM data · 24 hours
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$1.05/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Publicly Announced
Project status Development (AI)

Coordinates

DUID
Owner Kerang Power Pty Ltd
Commissioned Sep 2027
Expected closure 2056
Closure date
Technology Storage - Battery
Fuel Other - Other
Battery OEM
Battery platform / chemistry
Inverter OEM
Inverter / PCS model
Stats window
14 Jun 2026 00:00 → 14 Jun 2026 23:59 AEST

Dispatch & revenue

14 Jun 2026 00:00 → 14 Jun 2026 23:59 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Battery (BESS)
Capacity
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$1.05/MWh
Capex total (greenfield)

How this was derived
Search found project details but no disclosed total project cost.

Reference
Kerang Hybrid | ACE Power (medium confidence)
Source recorded 09 Jun 2026

Capex refurbishment
Capex / MWh storage
$369,198

Shown in table
$369.2k (2026 real AUD)

Reported / source value
$350.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
Fixed OPEX / MW-yr
$8,439

Shown in table
$8.4k (2026 real AUD)

Reported / source value
$8.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
2-hour BESS fixed O&M proxy from AEMO technical review.

Reference
2024 Energy Technology Cost and Technical Parameter Review (high confidence)
Source recorded 09 Jun 2026

Variable OPEX / MWh
$1.05

Shown in table
$1.05 (2026 real AUD)

Reported / source value
$1.00 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Battery variable O&M proxy from AEMO technical review.

Reference
2024 Energy Technology Cost and Technical Parameter Review (high confidence)
Source recorded 09 Jun 2026

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 09 Jun 2026

Notes
No plant-specific greenfield CAPEX announcement was found for Kerang Hybrid after searching owner/developer and related project sources. The project page identifies Kerang Hybrid as a proposed 161 MW DC solar farm with a 55 MW / 110 MWh AC-coupled battery, targeted to commence construction in late 2025 / operate in 2027, but does not disclose project cost. Operating-cost and performance assumptions therefore use AEMO/CSIRO GenCost 2024-25 / AEMO 2024 technical review battery benchmarks as fallback proxies; these are not plant-specific. Capacity was not provided in the prompt, so MW/MWh-specific scaling could not be completed.

Sources