14 Jun 2026 00:00 → 14 Jun 2026 15:20 AEST
| Capex total (greenfield) |
—
How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage |
$369,198
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr |
$8,439
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$1.05
Shown in table Reported / source value How this was derived Reference |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 09 Jun 2026
Notes
No plant-specific greenfield CAPEX announcement was found for Kerang Hybrid after searching owner/developer and related project sources. The project page identifies Kerang Hybrid as a proposed 161 MW DC solar farm with a 55 MW / 110 MWh AC-coupled battery, targeted to commence construction in late 2025 / operate in 2027, but does not disclose project cost. Operating-cost and performance assumptions therefore use AEMO/CSIRO GenCost 2024-25 / AEMO 2024 technical review battery benchmarks as fallback proxies; these are not plant-specific. Capacity was not provided in the prompt, so MW/MWh-specific scaling could not be completed.