| Capex total (greenfield) |
—
How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage |
$358,607
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr |
$25,615
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$1.54
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 09 Jun 2026
Notes
No plant-specific greenfield capex figure was found in accessible owner/government/public sources. ACE Power publicly states Kerang BESS is a proposed 103 MW / 206 MWh project, and Banpu later disclosed an acquisition of 100% interest in Kerang BESS, but the searched public materials did not disclose a total project investment amount. Commissioning/online date was not independently verified in the searched sources; internal date provided by user was not used as a source for capex.