Kangaroo Hills Wind Farm

BESS · Origin Energy Pty Ltd · Storage - Battery

Development AEMO: Publicly Announced Wind - Wind NEM data · 24 hours
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$0.53/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Publicly Announced
Project status Development (AI)

Coordinates

DUID
Owner Origin Energy Pty Ltd
Commissioned Oct 2028
Expected closure
Closure date
Technology Storage - Battery
Fuel Wind - Wind
Turbine OEM
Turbine model
Stats window
13 Jun 2026 01:50 → 14 Jun 2026 01:50 AEST

Dispatch & revenue

13 Jun 2026 01:50 → 14 Jun 2026 01:50 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Wind (onshore)
Capacity
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.53/MWh
Capex total (greenfield)

How this was derived
No reliable project-specific greenfield investment figure was located in the searched results.

Capex refurbishment
Capex / MW
$2,320,675

Shown in table
$2.32M (2026 real AUD)

Reported / source value
$2.20M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Server-side fallback capex per MW retained as instructed only when no plant-specific capex is found.

Fixed OPEX (annual)
Fixed OPEX / MW-yr
$58,017

Shown in table
$58.0k (2026 real AUD)

Reported / source value
$55.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Server-side fallback fixed O&M used.

Variable OPEX / MWh
$0.53

Shown in table
$0.53 (2026 real AUD)

Reported / source value
$0.50 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Server-side fallback variable O&M used.

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: low · Status: ai estimated · Capex basis: unknown · AI checked 09 Jun 2026

Notes
No plant-specific greenfield capex announcement was found in official/search results. Nemstats indicates this is a publicly announced 155 MW onshore wind project with 2028-10-01 COD; the storage-battery listing appears to be a separate paired asset in the same project name. No reliable source-backed total project cost was located, so internal fallback capex was not applied because the instruction set required project-specific capex search first and the search results were insufficient. O&M and performance fields use server-side defaults/fallbacks for wind onshore.