BESS · Origin Energy Pty Ltd · Storage - Battery
13 Jun 2026 01:50 → 14 Jun 2026 01:50 AEST
| Capex total (greenfield) |
—
How this was derived |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
$2,320,675
Shown in table Reported / source value How this was derived |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr |
$58,017
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$0.53
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: unknown · AI checked 09 Jun 2026
Notes
No plant-specific greenfield capex announcement was found in official/search results. Nemstats indicates this is a publicly announced 155 MW onshore wind project with 2028-10-01 COD; the storage-battery listing appears to be a separate paired asset in the same project name. No reliable source-backed total project cost was located, so internal fallback capex was not applied because the instruction set required project-specific capex search first and the search results were insufficient. O&M and performance fields use server-side defaults/fallbacks for wind onshore.