Junction Rivers (JRWF1)

Wind · Junction Rivers Pty Ltd · Wind Turbine - Onshore

AEMO: removed NSW1 Wind - Wind NEM data · 30 days
595 MW
Registered nameplate capacity
Est. SRMC
$0.53/MWh
Key information
Capacity
595 MW

AEMO status removed
Project status — (AI)

Region NSW1
Coordinates —

DUID JRWF1
Owner Junction Rivers Pty Ltd
Commissioned Oct 2029
Expected closure 2025
Closure date —
Technology Wind Turbine - Onshore
Fuel Wind - Wind
Turbine OEM —
Turbine model —
Stats window
26 Aug 2026 05:35 → 25 Sep 2026 05:35 AEST

Dispatch & revenue

26 Aug 2026 05:35 → 25 Sep 2026 05:35 AEST

No dispatch data for DUID JRWF1 in this period.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Wind (onshore)
Capacity
595 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.53/MWh
Capex total (greenfield)
$2,109.70M

Shown in table
$2,109.70M (2026 real AUD)

Reported / source value
$2,000.00M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Official project website states the project cost is $2 billion+; used as the plant-specific reported capex floor.

Reference
Junction Rivers (high confidence)
Source recorded 08 Jun 2026

Capex refurbishment
—
Capex / MW derived
$3,544,531

Shown in table
$3.54M (2026 real AUD)

Reported / source value
$3.36M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Per-MW cost is derived from the minimum stated project cost and the provided registered capacity.

Reference
Junction Rivers (medium confidence)
Source recorded 08 Jun 2026

Fixed OPEX (annual)
—
Fixed OPEX / MW-yr default
$55,000

Shown in table
$55.0k (2026 real AUD)

Variable OPEX / MWh
$0.53

Shown in table
$0.53 (2026 real AUD)

Reported / source value
$0.50 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No site-specific variable O&M disclosure found; retained user-provided fallback.

Fuel cost / GJ
—
Heat rate GJ/MWh
—

Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 08 Jun 2026

Notes
Project website describes Junction Rivers as a "$2 billion+" wind energy and storage project. The cited capex is set to the minimum explicitly stated figure ($2.0 billion nominal) because no more precise plant-specific total project cost was found in official sources. The project website and 2024 CIS announcement also indicate 750 MW / 69 turbines and a 600 MW wind + 200 MW / 800 MWh BESS concept; capex_per_mw is calculated using the 595.2 MW DUID capacity supplied by the user. O&M for this specific project was not publicly stated; variable O&M falls back to the provided internal default. For onshore wind benchmark context, GenCost/AEMO state that onshore wind capital costs rose further in 2024-25 and include work-camp costs, but those benchmark values were not used as project capex.