BESS · Junction Rivers Pty Ltd · Storage - Battery
13 Jun 2026 20:55 → 14 Jun 2026 20:55 AEST
| Capex total (greenfield) |
$2,109.70M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage derived |
$2,637,131
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$1.48M
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX / MW-yr |
$7,384
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$0.00
Shown in table Reported / source value How this was derived Reference |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 08 Jun 2026
Notes
Plant-specific public source states Junction Rivers is a '$2 billion+' wind energy and storage project; the 200 MW/800 MWh battery is part of the wider project, so capex is allocated proportionally to the battery share using the registered 200 MW / 800 MWh battery size. This is an inferred allocation, not a directly stated battery-only cost. AEMO/Aurecon battery benchmark for a 200 MW / 800 MWh (4-hour) co-located BESS implies about AUD 269.4m EPC and AUD 7,000/MW-year fixed O&M in 2024 terms, but the project-specific reported headline project cost takes precedence for capex under the user's hierarchy.