12 Jun 2026 23:45 → 13 Jun 2026 23:45 AEST
| Capex total (greenfield) |
—
|
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage |
$369,198
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$25,000
Shown in table |
| Variable OPEX / MWh default |
$1.50
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026
Notes
Project size identified as 250 MW / 500 MWh. No plant-specific reported greenfield capex was found in searched owner, government, or project sources, so capex remains unset rather than using a benchmark. AEMO 2024 review indicates BESS fixed O&M is highly variable and gives an indicative total annual O&M cost range for a 250 MW/500 MWh LFP BESS of $1.8m-$2.96m/yr, but the source does not provide a single project-specific figure; thus O&M fields are left unset pending a tighter basis.