08 Jun 2026 17:30 → 15 Jun 2026 17:30 AEST
| Capex total (greenfield) |
$4.64M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$4,219,409
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$121.8k
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$110,759
Shown in table Reported / source value |
| Variable OPEX / MWh |
$1.05
Shown in table Reported / source value |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026
Notes
No plant-specific greenfield capex announcement located for Jindabyne Mini Hydro. Snowy Hydro sources confirm the unit was built onto Jindabyne Dam and completed in 2009/1973 references, but no construction cost was found. Conventional hydropower benchmark O&M from AEMO/Aurecon was used as fallback. Because the site is a very small retrofit/mini-hydro asset, benchmark CAPEX would not be reliable without a project-specific source.