Jindabyne (JNDABNE1)

Hydro · Snowy Hydro Ltd · Hydro - Dam

Operational AEMO: In Service NSW1 Hydro - Water NEM data · 24 hours
1 MW
Registered nameplate capacity
Est. SRMC
$1.05/MWh
Key information
Capacity
1 MW

AEMO status In Service
Project status Operational (AI)

Region NSW1
Coordinates

DUID JNDABNE1
Owner Snowy Hydro Ltd
Commissioned
Expected closure 2070
Closure date
Technology Hydro - Dam
Fuel Hydro - Water
Turbine OEM
Turbine type / model
Stats window
14 Jun 2026 15:00 → 15 Jun 2026 15:00 AEST

Dispatch & revenue

14 Jun 2026 15:00 → 15 Jun 2026 15:00 AEST

No dispatch data for DUID JNDABNE1 in this period.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Hydro
Capacity
1 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$1.05/MWh
Capex total (greenfield)
$4.64M

Shown in table
$4.64M (2026 real AUD)

Reported / source value
$4.40M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Capex refurbishment
Capex / MW derived
$4,219,409

Shown in table
$4.22M (2026 real AUD)

Reported / source value
$4.00M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
$121.8k

Shown in table
$121.8k (2026 real AUD)

Reported / source value
$105.0k (2024 nominal)
Table total may differ if recalculated from $/MW × registered capacity after CPI adjustment.

Fixed OPEX / MW-yr
$110,759

Shown in table
$110.8k (2026 real AUD)

Reported / source value
$105.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Variable OPEX / MWh
$1.05

Shown in table
$1.05 (2026 real AUD)

Reported / source value
$1.00 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026

Notes
No plant-specific greenfield capex announcement located for Jindabyne Mini Hydro. Snowy Hydro sources confirm the unit was built onto Jindabyne Dam and completed in 2009/1973 references, but no construction cost was found. Conventional hydropower benchmark O&M from AEMO/Aurecon was used as fallback. Because the site is a very small retrofit/mini-hydro asset, benchmark CAPEX would not be reliable without a project-specific source.