13 Jun 2026 00:00 → 13 Jun 2026 23:59 AEST
| Capex total (greenfield) |
—
|
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage default |
$350,000
Shown in table |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr |
$23,734
Shown in table Reported / source value |
| Variable OPEX / MWh |
$0.00
Shown in table Reported / source value |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: unknown · AI checked 08 Jun 2026
Notes
No plant-specific greenfield capex announcement was found in the searched sources. Centennial Coal's Ivanhoe BESS project page identifies the project as proposed, with 700 MW / 2.8 GWh and a 25-year operational life, but it does not publish total project cost. Because no reported project investment was found, capex remains unset and server-side fallback should be used only as a temporary placeholder. For operating assumptions, AEMO/Aurecon 2024 review provides a BESS fixed O&M value of $22,500/MW-year for the 200 MW co-located BESS case; variable O&M is shown as included in the fixed O&M component (effectively nil as a separate line item).