Wind · Inverleigh Wind Farm Pty Ltd · Wind Turbine - Onshore
04 Jun 2026 01:20 → 05 Jun 2026 01:20 AEST
| Capex total (greenfield) |
$300.26M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
$2,874,440
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
$5.92M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$58,017
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$0.53
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 04 Jun 2026
Notes
Project website states the redesigned Inverleigh Wind Farm requires an investment of approximately AUD$214-234 million for up to 124MW total installed capacity; capex_total_aud uses the midpoint of that reported range as a nominal project estimate. The source also indicates a redesign for up to 102MW of wind plus 18-22MW AC solar and battery co-location, so the figure is for the broader hybrid project rather than wind-only capacity. No plant-specific refurbishment cost was found. O&M values use the provided internal default fallback for onshore wind.