BESS · Inverell BESS Development Pty Ltd · Storage - Battery
12 Jun 2026 22:35 → 13 Jun 2026 22:35 AEST
| Capex total (greenfield) |
—
|
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage |
$369,198
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$25,000
Shown in table |
| Variable OPEX / MWh |
$1.58
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026
Notes
No plant-specific greenfield capex announcement was found in available official or project sources. The project is still described by the developer and NSW planning sources as proposed/under development. Public sources confirm a 150 MW battery with 600 MWh storage on the project FAQ page, while another FAQ page references 1200 MWh; the 600 MWh figure is used here because it is consistent with 4-hour storage and the Council summary. Use benchmark capex only if a later project-specific investment figure cannot be found.