14 Jun 2026 00:00 → 14 Jun 2026 23:59 AEST
| Capex total (greenfield) |
$39.80M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage |
—
|
| Fixed OPEX (annual) |
$1.49M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$19,901
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$0.00
Shown in table Reported / source value How this was derived Reference |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 08 Jun 2026
Notes
Plant-specific project capital investment value of $32 million was reported in the NSW Department assessment report for the Hume Battery Energy Storage System (SSD10460). GSP Energy’s project page confirms Hume North BESS is a 75 MW / 150 MWh battery project at Lake Hume Village. No separate owner-published total project cost was found in the search results. O&M defaults to the AEMO 2025 large-scale lithium-ion BESS 4-hour benchmark (fixed O&M $16,000/MW-year; variable O&M included in fixed O&M). Asset life assumed from AEMO 2025 large-scale lithium-ion BESS technical parameters. Battery has zero direct fuel use and zero direct emissions intensity.