Hume BESS

BESS · GSP Energy Pty Ltd · Storage - Battery

Development AEMO: Publicly Announced Other - Other NEM data · 6h
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$0.00/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Publicly Announced
Project status Development (AI)

Coordinates

DUID
Owner GSP Energy Pty Ltd
Commissioned
Expected closure
Closure date
Technology Storage - Battery
Fuel Other - Other
Battery OEM
Battery platform / chemistry
Inverter OEM
Inverter / PCS model
Stats window
15 Jun 2026 00:00 → 15 Jun 2026 06:20 AEST

Dispatch & revenue

15 Jun 2026 00:00 → 15 Jun 2026 06:20 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Battery (BESS)
Capacity
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.00/MWh
Capex total (greenfield)
$39.80M

Shown in table
$39.80M (2026 real AUD)

Reported / source value
$32.00M (2021 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Plant-specific greenfield capital investment value reported by NSW planning assessment.

Reference
Hume Battery Energy Storage System (SSD10460) | Assessment Report (high confidence)
Source recorded 08 Jun 2026

Capex refurbishment
Capex / MWh storage
Fixed OPEX (annual)
$1.49M

Shown in table
$1.49M (2026 real AUD)

Reported / source value
$1.20M (2021 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX / MW-yr
$19,901

Shown in table
$19.9k (2026 real AUD)

Reported / source value
$16.0k (2021 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
AEMO benchmark O&M for 4-hour lithium-ion BESS used as fallback.

Reference
2025 Energy Technology Cost and Technical Parameter Review (high confidence)
Source recorded 08 Jun 2026

Variable OPEX / MWh
$0.00

Shown in table
$0.00 (2026 real AUD)

Reported / source value
$0.00 (2021 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No separate variable O&M for large-scale lithium-ion BESS in benchmark table.

Reference
2025 Energy Technology Cost and Technical Parameter Review (high confidence)
Source recorded 08 Jun 2026

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 08 Jun 2026

Notes
Plant-specific project capital investment value of $32 million was reported in the NSW Department assessment report for the Hume Battery Energy Storage System (SSD10460). GSP Energy’s project page confirms Hume North BESS is a 75 MW / 150 MWh battery project at Lake Hume Village. No separate owner-published total project cost was found in the search results. O&M defaults to the AEMO 2025 large-scale lithium-ion BESS 4-hour benchmark (fixed O&M $16,000/MW-year; variable O&M included in fixed O&M). Asset life assumed from AEMO 2025 large-scale lithium-ion BESS technical parameters. Battery has zero direct fuel use and zero direct emissions intensity.