BESS · The Trustee for the ARIF Hume BESS Holdings Trust · Storage - Battery
14 Jun 2026 02:40 → 15 Jun 2026 02:40 AEST
| Capex total (greenfield) |
$37.31M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage |
—
|
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr |
$31,095
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$1.87
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 08 Jun 2026
Notes
The project is Hume North Battery Energy Storage System (SSD-61842974), developed by Infrastructure Capital Services Pty Ltd as trustee for the ARIF Hume BESS Holdings Trust. Public planning documents identify the project as 75MW/150MWh (some documents show 74MW/148MWh). No plant-specific greenfield total project cost was found in the searched sources; the $30 million figure is the planning-portal capital investment value from the project assessment, which may not represent full construction EPC cost and should be treated cautiously. Internal battery O&M defaults were used.