Hume Bess (ARIF)

BESS · The Trustee for the ARIF Hume BESS Holdings Trust · Storage - Battery

Development AEMO: Publicly Announced Other - Other NEM data · 24 hours
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$1.87/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Publicly Announced
Project status Development (AI)

Coordinates

DUID
Owner The Trustee for the ARIF Hume BESS Holdings Trust
Commissioned
Expected closure
Closure date
Technology Storage - Battery
Fuel Other - Other
Battery OEM
Battery platform / chemistry
Inverter OEM
Inverter / PCS model
Stats window
13 Jun 2026 13:35 → 14 Jun 2026 13:35 AEST

Dispatch & revenue

13 Jun 2026 13:35 → 14 Jun 2026 13:35 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Battery (BESS)
Capacity
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$1.87/MWh
Capex total (greenfield)
$37.31M

Shown in table
$37.31M (2026 real AUD)

Reported / source value
$30.00M (2021 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
This is the closest explicit project investment figure found for the Hume battery project family, but it pertains to the earlier 20MW/40MWh approved Hume BESS and may not match the later Hume North BESS scope exactly.

Reference
Hume Battery Energy Storage System (Consent Surrendered) (medium confidence)
Source recorded 08 Jun 2026

Capex refurbishment
Capex / MWh storage
Fixed OPEX (annual)
Fixed OPEX / MW-yr
$31,095

Shown in table
$31.1k (2026 real AUD)

Reported / source value
$25.0k (2021 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Server-side default supplied by user; not source-verified in retrieved documents.

Variable OPEX / MWh
$1.87

Shown in table
$1.87 (2026 real AUD)

Reported / source value
$1.50 (2021 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Server-side default supplied by user; not source-verified in retrieved documents.

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 08 Jun 2026

Notes
The project is Hume North Battery Energy Storage System (SSD-61842974), developed by Infrastructure Capital Services Pty Ltd as trustee for the ARIF Hume BESS Holdings Trust. Public planning documents identify the project as 75MW/150MWh (some documents show 74MW/148MWh). No plant-specific greenfield total project cost was found in the searched sources; the $30 million figure is the planning-portal capital investment value from the project assessment, which may not represent full construction EPC cost and should be treated cautiously. Internal battery O&M defaults were used.

Sources