13 Jun 2026 00:00 → 13 Jun 2026 23:59 AEST
| Capex total (greenfield) |
—
|
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage |
$358,607
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$25,000
Shown in table |
| Variable OPEX / MWh |
$1.54
Shown in table Reported / source value |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026
Notes
Plant-specific greenfield capex was not found in owner, government, or project pages. Publicly available sources identify the Holloway BESS as a 250MW/1000MWh project near Armidale, with construction targeted for late 2026/early 2027 and a 12-month build; however, no total project investment figure was located. Because the site-specific capacity is now publicly stated, any future capex estimate should be based on a project-specific announcement if found; otherwise use the internal battery benchmark only as an estimated fallback.