Hazelwood BESS - KCI

BESS · International Power (Australia) Pty Ltd · Storage - Battery

Development AEMO: Publicly Announced Other - Other NEM data · 24 hours
—
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$1.50/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Publicly Announced
Project status Development (AI)

Coordinates —

DUID —
Owner International Power (Australia) Pty Ltd
Commissioned —
Expected closure —
Closure date —
Technology Storage - Battery
Fuel Other - Other
Battery OEM —
Battery platform / chemistry —
Inverter OEM —
Inverter / PCS model —
Stats window
24 Sep 2026 08:25 → 25 Sep 2026 08:25 AEST

Dispatch & revenue

24 Sep 2026 08:25 → 25 Sep 2026 08:25 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Battery (BESS)
Capacity
—
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$1.50/MWh
Capex total (greenfield)
—

How this was derived
No reliable plant-specific capital cost announcement was found in official owner/government sources for this specific DUID/site during the search.

Capex refurbishment
—
Capex / MWh storage
$369,198

Shown in table
$369.2k (2026 real AUD)

Reported / source value
$350.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
—
Fixed OPEX / MW-yr default
$25,000

Shown in table
$25.0k (2026 real AUD)

How this was derived
No plant-specific fixed O&M source found; internal fallback values were not used because source-backed assumptions were requested.

Variable OPEX / MWh default
$1.50

Shown in table
$1.50 (2026 real AUD)

How this was derived
No plant-specific variable O&M source found; internal fallback values were not used because source-backed assumptions were requested.

Fuel cost / GJ
—
Heat rate GJ/MWh
—

Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026

Notes
Public sources located confirm Hazelwood BESS is a 150 MW / 150 MWh battery commissioned on 14 June 2023 and jointly funded/developed by ENGIE and Eku Energy, but I did not find a plant-specific total project investment figure attributable to International Power (Australia) Pty Ltd or the Hazelwood BESS - KCI unit. The owner naming in the prompt does not match the public commissioning/licensing sources found, so capex is left blank rather than inferred from AEMO benchmarks. Internal fallback battery O&M values were not applied because the request prioritises source-backed values and no plant-specific O&M source was found.

Sources