BESS · International Power (Australia) Pty Ltd · Storage - Battery
13 Jun 2026 01:50 → 14 Jun 2026 01:50 AEST
| Capex total (greenfield) |
—
How this was derived |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage |
$369,198
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$25,000
Shown in table How this was derived |
| Variable OPEX / MWh default |
$1.50
Shown in table How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026
Notes
Public sources located confirm Hazelwood BESS is a 150 MW / 150 MWh battery commissioned on 14 June 2023 and jointly funded/developed by ENGIE and Eku Energy, but I did not find a plant-specific total project investment figure attributable to International Power (Australia) Pty Ltd or the Hazelwood BESS - KCI unit. The owner naming in the prompt does not match the public commissioning/licensing sources found, so capex is left blank rather than inferred from AEMO benchmarks. Internal fallback battery O&M values were not applied because the request prioritises source-backed values and no plant-specific O&M source was found.