Haunted Gully BESS - KCI

BESS · Vena Energy Services (Australia) Pty Ltd · Storage - Battery

Development AEMO: Publicly Announced Other - Other NEM data · 4h
—
Registered nameplate capacity — refresh AI for MW/MWh
Est. SRMC
$0.00/MWh
Key information

Capacity not yet researched — use Refresh equipment & project status (AI).

AEMO status Publicly Announced
Project status Development (AI)

Coordinates —

DUID —
Owner Vena Energy Services (Australia) Pty Ltd
Commissioned —
Expected closure —
Closure date —
Technology Storage - Battery
Fuel Other - Other
Battery OEM —
Battery platform / chemistry —
Inverter OEM —
Inverter / PCS model —
Stats window
26 Sep 2026 00:00 → 26 Sep 2026 04:00 AEST

Dispatch & revenue

26 Sep 2026 00:00 → 26 Sep 2026 04:00 AEST

No DUID specified. Open this page from the stats list or a generator profile.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Battery (BESS)
Capacity
—
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.00/MWh
Capex total (greenfield)
—

How this was derived
No project-specific construction/investment cost announcement was found in the searched owner/government/project finance sources.

Capex refurbishment
—
Capex / MWh storage
$369,198

Shown in table
$369.2k (2026 real AUD)

Reported / source value
$350.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
—
Fixed OPEX / MW-yr
$5,696

Shown in table
$5.7k (2026 real AUD)

Reported / source value
$5.4k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Used the 1-hour BESS benchmark fixed O&M value as the best available battery O&M proxy.

Reference
2024 Energy Technology Cost and Technical Parameter Review (high confidence)
Source recorded 08 Jun 2026

Variable OPEX / MWh
$0.00

Shown in table
$0.00 (2026 real AUD)

Reported / source value
$0.00 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
The benchmark table does not assign a separate variable O&M cost to BESS; it is included in the fixed component / long-term service treatment.

Reference
2024 Energy Technology Cost and Technical Parameter Review (high confidence)
Source recorded 08 Jun 2026

Fuel cost / GJ
—
Heat rate GJ/MWh
—

Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026

Notes
No plant-specific greenfield construction/investment cost could be verified from owner/developer, government, or project finance sources in the search results. Pre-fetched and additional searches found the project listing and capacity, but no total project cost announcement. Using AEMO/Aurecon 2024 battery storage benchmark only for operating assumptions: fixed O&M $5,400/MW-net-year; variable O&M is not separately specified for BESS and is treated as nil in the benchmark table; indicative design life 25 years. Capacity inferred from NEMStats listing as 400 MW; no MWh duration was verified. Emissions, heat rate, and fuel cost are not applicable for battery storage.