BESS · Vena Energy Services (Australia) Pty Ltd · Storage - Battery
15 Jun 2026 00:00 → 15 Jun 2026 17:45 AEST
| Capex total (greenfield) |
—
How this was derived |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage |
$369,198
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr |
$5,696
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$0.00
Shown in table Reported / source value How this was derived Reference |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026
Notes
No plant-specific greenfield construction/investment cost could be verified from owner/developer, government, or project finance sources in the search results. Pre-fetched and additional searches found the project listing and capacity, but no total project cost announcement. Using AEMO/Aurecon 2024 battery storage benchmark only for operating assumptions: fixed O&M $5,400/MW-net-year; variable O&M is not separately specified for BESS and is treated as nil in the benchmark table; indicative design life 25 years. Capacity inferred from NEMStats listing as 400 MW; no MWh duration was verified. Emissions, heat rate, and fuel cost are not applicable for battery storage.