BESS · Pacific Hydro Haughton Solar Farm Pty Ltd · Storage - Battery
12 Jun 2026 23:45 → 13 Jun 2026 23:45 AEST
| Capex total (greenfield) |
$738.40M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MWh storage |
—
|
| Fixed OPEX (annual) |
$5.27M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$26,371
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$1.58
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 08 Jun 2026
Notes
Plant-specific project cost was found for the broader Haughton Solar Farm 2 and BESS project, which includes both a 300 MW solar farm and a 200 MW / 2-hour BESS. The reported capital expenditure appears to cover the combined project, not the BESS alone; capex_per_mw_aud and capex_per_mwh_aud are therefore blended estimates based on the full project cost and registered BESS capacity. No separate BESS-only greenfield capex was found. O&M values for battery storage were not independently verified for this site; fallback defaults retained.